

— Mr. Medy - Palembang
Construction on this contemporary tropical home proceeded relatively smoothly, but still presented a number of technical challenges. The gently sloping terrain and narrow access required more careful logistical planning, though still adequate. The construction process took longer due to the need to source specialist materials as requested by the owner. Classic tiles had to be sourced directly in Java to ensure quality, while the frog tiles were selected from the finest reclaimed materials to create a strong vintage feel. For the antique teak and joglo doors, we collaborated with local craftsmen in Bali, while also sourcing suitable logs to complement the design.
— Mr. Medy - Palembang
The Bloka Construction team will contact you immediately during working hours (08.00–17.00 WIB).